As part of the Coating Visual Inspection process is to verify the Blast Process Profile, Dry Film Thickness (DFT) and Adhesive Test. With reference to the SSPC-PA 2 Standards for guidance. Verify there no Coating imperfects such Runs, lack of applicable Coating between each application.

LMRP ready for Final coat

Preparing receiver for primer coat. Primer will be applied 12-4-14

Application of final coat.

Annular Ring – Final Coat complete