As part of the Coating Visual Inspection process is to verify the Blast Process Profile, Dry Film Thickness (DFT) and Adhesive Test. With reference to the SSPC-PA 2 Standards for guidance. Verify there no Coating imperfects such Runs, lack of applicable Coating between each application.

Welds inspected

MT Calibration

MT being performed

Stamped ID numbers

© Copyright 2017 All Rights Reserved

Powered by: