As part of the Inspection and Witness process, the Surveyor/Engineer would witness the Factory Acceptance Testing (FAT) at the Supplier facility. Verify the Test documentation is approved and correct revision, witness each function test as specified in the FAT. Verify the functionality testing as listed in the FAT document (Including Hydro, Load, and Drift Testing), verify all test equipment is calibrated.

Load Test Set up

Traceability verified

Shell pressure test results

Preheat prior to welding